Year of Completion | Site/ Location | Country | Project/ Type | Owner | Surface Areas (m2) | Type | Activity |
---|---|---|---|---|---|---|---|
Ongoing | PPL Shipyard (Tuas) Singapore | Singapore | P2052 / Whole Rig Internal & External | PPL Shipyard | 125,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2016 | Bintan Offshore, Indonesia | Indonesia | M1222 Jack up rig Blk LQP & HD | Keppel FELS | 10,200 | New Ship/Rig/Platform | Open Blasting |
2016 | Bintan Offshore, Indonesia | Indonesia | B366 Jack up rig Blk COP,HD,RDP,1MC & 2MC | Transocean | 6,650 | New Ship/Rig/Platform | Open Blasting |
2016 | Bintan Offshore, Indonesia | Indonesia | B373 Jack up rig Blk COP,WLP,RDP,7P, 6DMP & Crane Column | Fecon Int | 17,060 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2016 | Bintan Offshore, Indonesia | Indonesia | B370 Jack up rig Blk HD | TS Offshore Limited | 1,200 | New Ship/Rig/Platform | Open Blasting |
2016 | Bintan Offshore, Indonesia | Indonesia | B378 Jack up rig Blk HD,UCC,SSH,CTU & WLP | JDC (Hakuryu 15) | 7,150 | New Ship/Rig/Platform | Open Blasting |
2016 | DDW PAX OCEAN- GRAHA | Indonesia | NG8001 Jackup Drilling Unit | Hong Kong Petrolor (Jing Hang) | 65,000 | New Ship/Rig/Platform | Hydro Jetting / Tank Coating |
2016 | Malaysia Marine and Heavy Engineering | Malaysia | MALIKAI TLP HULL | SHELL | 140,000 | New Ship/Rig/Platform | Open Blasting |
2016 | PPL Shipyard (Tuas) Singapore | Singapore | P2053 / Whole Rig Internal & External | PPL Shipyard | 125,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2015 | Siemens, Indonesia | Indonesia | JANGKRIK COMPLEX PROJECT | Jangkrik | 16,000 | New Ship/Rig/Platform | Open Blasting |
2015 | Siemens, Indonesia | Indonesia | YAMAL LNG (Batch 2) ESS 003 | Yamal Lng | 27,500 | New Ship/Rig/Platform | Open Blasting |
2015 | Bintan Offshore, Indonesia | Indonesia | B378 Jack up rig Blk RDP & 4C | JDC (Hakuryu 15) | 4,500 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2015 | Bintan Offshore, Indonesia | Indonesia | B369 Jack up rig Blk HD | Ensco | 1,400 | New Ship/Rig/Platform | Open Blasting |
2015 | Bintan Offshore, Indonesia | Indonesia | B362 Jack up rig Blk SPONSON PORT & STBD | Floatel International | 4,000 | New Ship/Rig/Platform | Open Blasting |
2015 | Bintan Offshore, Indonesia | Indonesia | B366 Jack up rig Blk 4C | Transocean | 3,400 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2015 | Bintan Offshore, Indonesia | Indonesia | B372 Jack up rig Blk 4C & HD | Fecon Int | 4,600 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2015 | Bintan Offshore, Indonesia | Indonesia | M963 Semi Sub Blk 28 | Petrobras (Bracuhy) | 7,100 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2015 | Bintan Offshore, Indonesia | Indonesia | B361 Jack up rig Blk HT | Parden Holding (Paraiso II) | 1,200 | New Ship/Rig/Platform | Open Blasting |
2015 | Bintan Offshore, Indonesia | Indonesia | B376 Jack up rig Blk HT | UMV Holding | 1,200 | New Ship/Rig/Platform | Open Blasting |
2015 | Bintan Offshore, Indonesia | Indonesia | B352 Jack up rig Blk HT | Clear Water | 1,200 | New Ship/Rig/Platform | Open Blasting |
2015 | Bintan Offshore, Indonesia | Indonesia | B377 Jack up rig Blk HT , LQ CENTRE,LQ STBD | GDI (Halul) | 14,800 | New Ship/Rig/Platform | Open Blasting |
2015 | Bintan Offshore, Indonesia | Indonesia | R401 Jack up rig Blk HELIDECK TRUSS | Stane Clyde | 1,200 | New Ship/Rig/Platform | Open Blasting |
2015 | Bintan Offshore, Indonesia | Indonesia | B365 Jack up rig Blk HD,UCC,5P&5S | Transocean | 16,800 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2015 | Bintan Offshore, Indonesia | Indonesia | M1222 Jack up rig Blk 4C | Keppel FELS | 3,400 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2015 | Bintan Offshore, Indonesia | Indonesia | B364 Jack up rig Blk 4C | Transocean | 3,400 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2015 | DDW PAX OCEAN- GRAHA | Indonesia | L209A Jackup Drilling Unit | Hong Kong Petrolor (Jing Xuan) | 65,000 | New Ship/Rig/Platform | Hydro Jetting / Tank Coating |
2015 | Malaysia Marine and Heavy Engineering | Malaysia | F14 SUBSTRUCTURE & BUCKLE TRIGGER | SHELL | 13,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2015 | Malaysia Marine and Heavy Engineering | Malaysia | KEPPEL BLOCK 360 | Dyna-Mac Engineering Sdn. Bhd | 3,500 | New Ship/Rig/Platform | Tank coating |
2015 | Keppel FELS Singapore | Singapore | B377/ Jack up rig B class | Gulf Drilling International | 60,000 | New Ship/Rig/Platform | Open Blasting |
2015 | Keppel FELS Singapore | Singapore | B361/ Jack up rig B class | Grupa R Drilling | 60,000 | New Ship/Rig/Platform | Open Blasting |
2015 | Baku Shipyard | Azerbaijan | H104 DSS38M-Drilling Semisubermersible Unit | 333,000 | New Ship/Rig/Platform | Open Blasting / Tank coating | |
2014 | Bintan Offshore, Indonesia | Indonesia | M962 Semi Sub Blk 25,26,27&28 | Petrobras (Frade Majuro) | 29,400 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | B349 Jack up rig Blk LQ CENTRE | Pemex Exploracion Y Produccion | 4,800 | New Ship/Rig/Platform | Open Blasting |
2014 | Bintan Offshore, Indonesia | Indonesia | B358 Jack up rig Blk 4 C | FTS Drriks Pte Ltd | 3,200 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | B363 Jack up rig Blk 6DP,6DS & 4C | PV Drilling Overseas | 12,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | B355 Jack up rig Blk 4C | Grupo R (Cantarell 2) | 3,400 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | B350 LQ STBD ENGINE HOUSE , LQ CENTRE & HD | Pemex Exploracion Y Produccion | 6,650 | New Ship/Rig/Platform | Open Blasting |
2014 | Bintan Offshore, Indonesia | Indonesia | B376Jack up rig Blk 6DP,6DS & 4C | UMV Holding | 12,100 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | B354 Jack up rig Blk LQ Center & 4C | Grupo R (Cantarell 1) | 8,600 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | B356 Jack up rig Blk HD,6DS & 4C | Grupo R (Cantarell 3) | 8,900 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | B358 Jack up rig Blk HD | FTS Drriks Pte Ltd | 1,200 | New Ship/Rig/Platform | Open Blasting |
2014 | Bintan Offshore, Indonesia | Indonesia | B361 Jack up rig Blk LQ (STBD) & LQ CENTRE | Parden Holding (Paraiso II) | 14,200 | New Ship/Rig/Platform | Open Blasting |
2014 | Bintan Offshore, Indonesia | Indonesia | B348 Jack up rig Blk BLISTER | Floatel International | 3,800 | New Ship/Rig/Platform | Open Blasting |
2014 | Bintan Offshore, Indonesia | Indonesia | B357 Jack up rig Blk HD,4C | Parden Holding (Paraiso) | 4,600 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | B365 Jack up rig Blk 4C | Transocean | 3,400 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Bintan Offshore, Indonesia | Indonesia | M963 Semi Sub Blk 25 | Petrobras (Bracuhy) | 7,400 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | PT Galangan Balikpapan Utama, Indonesia | Indonesia | Jack up rig , Barge & Tug boat | TOTAL | 15,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2014 | Malaysia Marine and Heavy Engineering | Malaysia | F14DR TOPSIDES/F14/F29 PROCESS MODULE PROJECT | SHELL | 43,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2014 | Keppel FELS Singapore | Singapore | B349/ Jack up rig B class | Pemex (Mexican Petroleums) | 35,000 | New Ship/Rig/Platform | Open Blasting |
2014 | Keppel FELS Singapore | Singapore | B356/ Jack up rig B class | Grupa R Drilling | 25,000 | New Ship/Rig/Platform | Open Blasting |
2014 | Keppel FELS Singapore | Singapore | B359/ Jack up | Ensco | 40,000 | New Ship/Rig/Platform | Open Blasting |
2014 | Keppel FELS Singapore | Singapore | B332/ Jack up rig CJ70 | Maersk Drilling | 35,000 | New Ship/Rig/Platform | Open Blasting |
2014 | Nakilat - Keppel Offshore Marine Yard (NKOM) Qatar | Qatar | Floating Dock Project | Qatar Petroleum | 147,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2014 | Nakilat - Keppel Offshore Marine Yard (NKOM) Qatar | Qatar | Liftboat Project | Gulf Drilling company | 81,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2013 | Bintan Offshore, Indonesia | Indonesia | B342 Jack up rig Blk 4C,6DP,6DS & LQC | Gulf Drilling Int | 15,600 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2013 | Bintan Offshore, Indonesia | Indonesia | B353 Jack up rig Blk 6DP,6MP,6DS&6MS | Star Drilling Pte Ltd | 10,800 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2013 | Bintan Offshore, Indonesia | Indonesia | B330 Jack up rig Blk E Gen Rm & LQFC | Ensco | 2,900 | New Ship/Rig/Platform | Open Blasting |
2013 | Bintan Offshore, Indonesia | Indonesia | B346 Jack up rig Blk LQAC | Ensco | 2,300 | New Ship/Rig/Platform | Open Blasting |
2013 | Bintan Offshore, Indonesia | Indonesia | M883 Semi Sub Blk 25,26,27&28 | Petrobras (Urca Majuro) | 28,600 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2013 | PT PAL, Indonesia | Indonesia | Oil Product Tanker / Tank Coating | PERTAMINA (MT. PAGERUNGAN) | 18,500 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2013 | Keppel FELS Singapore | Singapore | B323/ Jack up rig super A class | Discovery Offshore / Hercules | 135,000 | New Ship/Rig/Platform | Open Blasting |
2013 | Keppel FELS Singapore | Singapore | B330/ Jack up | Ensco | 20,000 | New Ship/Rig/Platform | Open Blasting |
2013 | PPL Shipyard (Tuas) Singapore | Singapore | P2050 / Whole Rig Internal & External | Japan Drilling Company | 125,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2013 | Baku Shipyard | Azerbaijan | H101 Floating Dry Dock | 720,000 | New Ship/Rig/Platform | Open Blasting / Tank coating | |
2012 | Malaysia Marine and Heavy Engineering | Malaysia | KPNG KINABALU | PETRONAS | 128,000 | New Ship/Rig/Platform | Tank coating |
2012 | Keppel FELS Singapore | Singapore | B322/ Jack up rig | Discovery Offshore / Hercules | 135,000 | New Ship/Rig/Platform | Open Blasting |
2012 | Keppel FELS Singapore | Singapore | B345/ Jack up rig | Asia Offshore Drilling | 80,000 | New Ship/Rig/Platform | Open Blasting |
2012 | Keppel FELS Singapore | Singapore | B320/ Jack up Rig | Asia Offshore Drilling | 10,000 | New Ship/Rig/Platform | Open Blasting |
2012 | Keppel FELS Singapore | Singapore | B334/ Jack up Rig | Vision Drilling | 30,000 | New Ship/Rig/Platform | Open Blasting |
2011 | Malaysia Marine and Heavy Engineering | Malaysia | GAGASAN SELANGOR | MMHE | 4,400 | New Ship/Rig/Platform | Tank coating |
2011 | Keppel FELS Singapore | Singapore | R346Transocean Jack Bates/ Semi-Sub / Tank Coating | Transocean | 15,000 | New Ship/Rig/Platform | Open Blasting |
2011 | Keppel FELS Singapore | Singapore | R342 Hakuryu-5 /Semi- Sub /Tank Coating | Japan Drilling | 15,000 | New Ship/Rig/Platform | Open Blasting |
2011 | PPL Shipyard (Tuas) Singapore | Singapore | P2033 Atwood/ Whole Rig Internal & External | Atwood | 125,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2010 | Malaysia Marine and Heavy Engineering | Malaysia | GAGASAN SABAH H -122 | BPSY | 83,000 | New Ship/Rig/Platform | Tank coating |
2010 | Malaysia Marine and Heavy Engineering | Malaysia | JUBILEE EXTERNAL TURRET | SOFEC | 46,000 | New Ship/Rig/Platform | Tank coating |
2010 | Malaysia Marine and Heavy Engineering | Malaysia | LORELAY | MISC | 18,000 | New Ship/Rig/Platform | Tank coating |
2010 | Malaysia Marine and Heavy Engineering | Malaysia | SEMUA BERSATU | MISC | 8,000 | New Ship/Rig/Platform | Tank coating |
2010 | Malaysia Marine and Heavy Engineering | Malaysia | IDEMITSU MARU | MMHE | 20,000 | New Ship/Rig/Platform | Tank coating |
2010 | Malaysia Marine and Heavy Engineering | Malaysia | BUNGA ALAMANDA | MMHE | 17,000 | New Ship/Rig/Platform | Tank coating |
2010 | Keppel FELS Singapore | Singapore | R342 -Semi-Sub | Japan Drilling | 25,000 | New Ship/Rig/Platform | Open Blasting |
2010 | Keppel FELS Singapore | Singapore | R327-Semi-Sub | Transocean | 40,000 | New Ship/Rig/Platform | Open Blasting |
2010 | Keppel FELS Singapore | Singapore | B316-Jack up | Petrovietnam | 25,000 | New Ship/Rig/Platform | Open Blasting |
2010 | Keppel FELS Singapore | Singapore | B315-Semi-Sub | Ensco | 10,000 | New Ship/Rig/Platform | Open Blasting |
2010 | Keppel FELS Singapore | Singapore | B310-Semi Sub | Ensco | 25,000 | New Ship/Rig/Platform | Open Blasting |
2010 | Keppel FELS Singapore | Singapore | B278/B286/ B298/ B303- Jack up&Semi-Sub/ Internal & External | Ensco | 100,000 | New Ship/Rig/Platform | Open Blasting |
2010 | PPL Shipyard (Tuas) Singapore | Singapore | P2030 Transocean Honor/ Leg Wells, Cantilever, Drill Floor, Legs | Transocean | 40,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2010 | PPL Shipyard (Tuas) Singapore | Singapore | P2023/ Jack up Whole Rig Internal & External | Egyptian | 125,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2010 | Malaysia Marine and Heavy Engineering | Malaysia | LNG TENAGA LIMA | MISC | 22,000 | New Ship/Rig/Platform | Tank coating |
2009 | Bintan Offshore, Indonesia | Indonesia | B295 Jack up rig Blk 25 & 27 | Maersk | 10,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2009 | Bintan Offshore, Indonesia | Indonesia | B300 Jack up rig Blk7P | 25,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating | |
2009 | Bintan Offshore, Indonesia | Indonesia | B302 Jack up rig Blk51A & 51C | 35,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating | |
2009 | Bintan Offshore, Indonesia | Indonesia | B309 Semi Sub Blk35 & 36 | 35,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating | |
2009 | Malaysia Marine and Heavy Engineering | Malaysia | B 11 K TOPSIDE | SHELL | 50,000 | New Ship/Rig/Platform | Tank coating |
2009 | Malaysia Marine and Heavy Engineering | Malaysia | GAGASAN SABAH H -121 | BPSY | 9,000 | New Ship/Rig/Platform | Tank coating |
2009 | Malaysia Marine and Heavy Engineering | Malaysia | TIOMAN 12 | SEADRILL | 76,000 | New Ship/Rig/Platform | Tank coating |
2009 | Keppel FELS Singapore | Singapore | B295-Blk34 - Semi-Sub | Maersk | 22,000 | New Ship/Rig/Platform | Open Blasting |
2009 | Keppel FELS Singapore | Singapore | B303-Semi-Sub-Drill Floor | Ensco | 7,000 | New Ship/Rig/Platform | Open Blasting |
2009 | Keppel FELS Singapore | Singapore | B288-Semi-Sub/ Internal & External | Global Santa Fe | 30,000 | New Ship/Rig/Platform | Open Blasting |
2009 | Keppel FELS Singapore | Singapore | B281-Semi-Sub/ Internal & External | Maesk | 50,000 | New Ship/Rig/Platform | Open Blasting |
2009 | PPL Shipyard (Tuas) Singapore | Singapore | P2021 Topaz Driller/ Whole Rig Internal & External | Vantage Drilling | 125,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | ENSCO 8503 - Semi-Sub | Ensco | 60,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | ENSCO 8504-Semi Sub | Ensco | 60,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Sanko " | Keppel Batangas | 3,600 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " New Auspicious " | Keppel Batangas | 2,500 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Power Barge 102 " | Keppel Batangas | 2,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Maria Xenia " | Keppel Batangas | 1,200 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Big Atin " | Keppel Batangas | 4,500 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Lady Guro " | Keppel Batangas | 4,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Greyhound " | Keppel Batangas | 2,750 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Luzern " | Keppel Batangas | 5,200 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Superferry 5 " | Keppel Batangas | 2,800 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Batangas Philippines | Philippines | M/V " Sinulog " | Keppel Batangas | 1,500 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2009 | Keppel Kazakhstan, Kazakhstan | Kazakhstan | Pontoon | AGIP/KKL | 15,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2008 | Bintan Offshore, Indonesia | Indonesia | B281 Semi Sub | Maersk | 15,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2008 | Bintan Offshore, Indonesia | Indonesia | B296 Semi Sub | 45,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating | |
2008 | Bintan Offshore, Indonesia | Indonesia | B288/294/291/297 Jack up rig | 3,500 | New Ship/Rig/Platform | Open Blasting / Tank Coating | |
2008 | Bintan Offshore, Indonesia | Indonesia | B276 Semi Sub | 10,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating | |
2008 | Bintan Offshore, Indonesia | Indonesia | B295 Semi Sub | 8,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating | |
2008 | Malaysia Marine and Heavy Engineering | Malaysia | LNG TENAGA TIGA | MISC | 132,000 | New Ship/Rig/Platform | Tank Coating |
2008 | Keppel FELS Singapore | Singapore | B296-Blk34 | Keppel FELS | 22,000 | New Ship/Rig/Platform | Open Blasting |
2008 | Keppel FELS Singapore | Singapore | B280-Semi-Sub/ Internal & External | Maesk | 22,000 | New Ship/Rig/Platform | Open Blasting |
2008 | PPL Shipyard (Tuas) Singapore | Singapore | P2016 Wilseeker/ Whole Rig Internal & External | Awilco | 125,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2008 | Keppel Batangas Philippines | Philippines | ENSCO 8502 | Ensco | 60,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2008 | Keppel Batangas Philippines | Philippines | QGP Project | QGP | 50,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2008 | Keppel Batangas Philippines | Philippines | FLOATEL Project | Floatel | 49,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2008 | Keppel Batangas Philippines | Philippines | MAERSK Project | Maersk | 20,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2008 | Keppel Batangas Philippines | Philippines | M/V " Maritime Jingan " | 6,040 | New Ship/Rig/Platform | Open Blasting / Tank coating | |
2008 | Keppel Batangas Philippines | Philippines | M/V " Kamogawa " | 3,140 | New Ship/Rig/Platform | Open Blasting / Tank coating | |
2008 | Keppel Batangas Philippines | Philippines | M/V " Glarus " | 2,400 | New Ship/Rig/Platform | Open Blasting / Tank coating | |
2008 | Keppel Batangas Philippines | Philippines | M/V " Dyvi Adriatic " | 2,400 | New Ship/Rig/Platform | Open Blasting / Tank coating | |
2007 | Malaysia Marine and Heavy Engineering | Malaysia | STYBARROW INTERNAL TURRET | SOFEC | 35,000 | New Ship/Rig/Platform | Tank coating |
2007 | Malaysia Marine and Heavy Engineering | Malaysia | LNG TENAGA LIMA | MISC | 70,000 | New Ship/Rig/Platform | Tank coating |
2007 | Malaysia Marine and Heavy Engineering | Malaysia | HSIEN YUAN II | MMHE | 19,000 | New Ship/Rig/Platform | Tank coating |
2007 | Keppel FELS Singapore | Singapore | R293/R303 -Semi-Sub/ Internal & External | Diamond Offshore | 12,000 | New Ship/Rig/Platform | Open Blasting |
2007 | Keppel Batangas Philippines | Philippines | GSF Project | GSF | 14,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2007 | Keppel Batangas Philippines | Philippines | ENSCO 8501 | Ensco | 40,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2007 | Keppel Batangas Philippines | Philippines | M/V " Obo Chief " | 1,125 | New Ship/Rig/Platform | Open Blasting / Tank coating | |
2007 | Keppel Kazakhstan, Kazakhstan | Kazakhstan | TB90 Barges/ Internal & External | Agip KCO | 50,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2007 | Keppel Kazakhstan, Kazakhstan | Kazakhstan | Well Head Protection | Keppel Kazakhstan | 15,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2006 | PT PAL, Indonesia | Indonesia | Block Blasting for Projects 229/230/231/236/237 | Geden Lauterjung | 50,000 | New Ship/Rig/Platform | Open Blasting / Tank Coating |
2006 | Malaysia Marine and Heavy Engineering | Malaysia | BUNGA TANJUNG | MMHE | 7,400 | New Ship/Rig/Platform | Tank coating |
2006 | Malaysia Marine and Heavy Engineering | Malaysia | EAGLE MILWAUKEE | MMHE | 37,000 | New Ship/Rig/Platform | Tank coating |
2006 | Malaysia Marine and Heavy Engineering | Malaysia | MT EAGLE AURIGA | MMHE | 6,600 | New Ship/Rig/Platform | Tank coating |
2006 | Keppel Batangas Philippines | Philippines | ENSCO 8500 | Ensco | 20,000 | New Ship/Rig/Platform | Open Blasting / Tank coating |
2005 | Malaysia Marine and Heavy Engineering | Malaysia | BOW PROSPER | MMHE | 11,000 | New Ship/Rig/Platform | Tank coating |
2005 | Malaysia Marine and Heavy Engineering | Malaysia | MT BOW POWER | MMHE | 14,000 | New Ship/Rig/Platform | Tank coating |
2005 | Malaysia Marine and Heavy Engineering | Malaysia | LNG TENAGA 2 | MISC | 81,000 | New Ship/Rig/Platform | Tank coating |
2003 | Malaysia Marine and Heavy Engineering | Malaysia | TORM MARGRETHE | MMHE | 13,000 | New Ship/Rig/Platform | Tank coating |
2003 | Malaysia Marine and Heavy Engineering | Malaysia | BUNGA KERTAS | MISC | 28,000 | New Ship/Rig/Platform | Tank coating |
2001 | Malaysia Marine and Heavy Engineering | Malaysia | MT WENATCHI | MMHE | 25,000 | New Ship/Rig/Platform | Tank coating |